New kitchen electrical installation with island pendant lighting and recessed downlights in a Hampshire home

New Circuits & Installations

New Electrical Installationsin Fleet and Hampshire,First Fix Through to Final Test

Extending, converting a loft or fitting out a new build brings a run of decisions about circuits, positions and supply capacity. Every stage from first fix cabling to final testing is carried out to BS 7671 and quoted individually before work starts.

Every new installation is quoted individually after seeing the drawings or the site. NAPIT Approved Domestic Installer, Reg. 79130, quotes are free.

13 years

On the tools as an electrician

NAPIT 79130

Approved Domestic Installer

£2m

Public liability insurance

£250,000

Professional indemnity cover

The service

What counts as a new electrical installation

New installation work covers anything being wired from scratch rather than repaired or replaced: new circuits for an extension, additional sockets and lighting in a converted loft or garage, a new supply to an outbuilding, or the complete first fix and second fix of a new build room. It follows the same BS 7671 requirements as a rewire but is usually confined to a specific area rather than the whole property.

Work is carried out in two distinct stages. First fix happens before plastering and flooring: cable is run through joists and studwork, back boxes are set, and containment for lighting and sockets is put in place. Second fix follows once decoration is done: accessories, light fittings and any new consumer unit circuits are connected, then tested.

Because every project differs in scope, drawings, number of points and existing supply capacity, new installation work is quoted individually rather than against a price list. A conversation about the drawings or a site visit is enough to give an accurate written quote before anything is booked in.

Existing circuits are checked where new work connects into them, since adding load to an already-stretched consumer unit or an old ring circuit is a common way new work goes wrong if it is not properly assessed first.

Homeowners extending or converting

Kitchen extensions, loft conversions and garage conversions all need new circuits designed around the finished layout, not squeezed into whatever spare capacity happens to exist.

Renovators and self-builders

A full first fix and second fix installation for a gutted property or new build room, planned alongside plastering, flooring and kitchen fitting.

Anyone adding a specific new supply

A new circuit for a hot tub, workshop, shed or garden office, sized and protected correctly and connected back to a consumer unit that has the capacity to take it.

What happens if it waits

What goes wrong when new work is not properly designed

New installation work looks straightforward on the surface, but most of the problems that surface later come from decisions made before a single cable was run.

Overloading an existing consumer unit

Adding new circuits to a board that is already at capacity, or that lacks spare ways, either overloads the supply or means the board should have been replaced first.

Circuits not designed for the actual load

A cable sized for lighting cannot safely carry a shower or an electric hob. Getting this wrong at first fix stage means opening up finished walls to correct it later.

Poorly planned socket and lighting positions

Positions agreed on-site before plastering are far easier and cheaper to adjust than positions discovered to be wrong once a kitchen or bathroom is fitted.

Unnotified or uncertified work

New circuits and consumer unit changes are notifiable under Building Regulations. Work that is not certified and registered can cause problems at the point of sale.

Conflicts with other trades

Cable routes clashing with plumbing, insulation or joists installed by other trades cause delays and rework if first fix is not properly sequenced and coordinated.

Supply capacity assumptions

Assuming the incoming supply can take a new large load, such as an EV charger or an outbuilding supply, without checking main fuse rating and cable capacity first.

Common mistakes worth avoiding

  • Agreeing socket and switch positions verbally on site without a written plan, then finding them in the wrong place once plaster and paint are on.
  • Adding new circuits without checking whether the existing consumer unit has spare capacity or spare ways.
  • Treating new circuit work as a job that does not need certification because it is 'just an extra socket'.
  • Booking electrical first fix before confirming final positions for kitchen units, bathroom fittings or built-in furniture.
  • Choosing cable sizes and circuit protection based on cost alone rather than the actual load the circuit will carry.

How it works

The step-by-step system used on every job

  1. 01

    Design and quote

    Drawings, room layouts or a site visit are used to plan circuit routes, socket and light positions, and any impact on the existing consumer unit, with a written individual quote provided.

  2. 02

    First fix

    Cable is run through joists, studwork and voids, and back boxes and containment are set in place before plastering, boarding or flooring goes down.

  3. 03

    Coordination with other trades

    First fix is sequenced around plumbing, plastering and building work so cable routes are agreed and clashes are avoided before anything is closed up.

  4. 04

    Second fix

    Once decoration is complete, sockets, switches, light fittings and any new consumer unit circuits are connected and finished to the agreed specification.

  5. 05

    Testing and certification

    New circuits are tested to BS 7671, an Electrical Installation Certificate is issued, and notifiable work is registered through NAPIT before handover.

What you get

The difference it makes in the house

Individually designed circuits

Cable and protection are sized for the actual load, not a generic assumption, so new circuits perform reliably from day one.

Positions agreed before plastering

Socket, switch and light positions are confirmed at first fix stage, avoiding costly changes once walls and floors are finished.

Existing supply properly assessed

Consumer unit capacity and incoming supply are checked before new circuits are added, so new work does not create a hidden overload.

A price agreed before work starts

Individual quotes based on drawings or a site visit mean the scope is clear and there are no unexplained extras once work is under way.

Coordinated with other trades

First fix is planned around plumbing, plastering and joinery so the job runs to schedule rather than causing delays for everyone else on site.

Full certification on completion

An Electrical Installation Certificate is issued and notifiable work registered through NAPIT, giving a clear paper trail for building control and future sale.

In detail

How new installation work is planned and carried out

New circuits, sockets, lighting and supplies each bring their own planning considerations. What follows is how this plays out on typical extensions, conversions and new builds around Fleet and the surrounding area.

Extensions and kitchen refits

Kitchen extensions typically need new socket circuits, dedicated circuits for ovens and hobs, lighting circuits, and sometimes an outdoor supply for the garden. First fix has to be coordinated closely with the kitchen fitter's plan, since appliance positions dictate where dedicated circuits terminate.

Where an extension adds meaningful load to the property, the existing consumer unit is checked for spare capacity. It is common for a new installation project to include a consumer unit upgrade alongside the new circuits themselves, particularly in older properties where the board was already close to full.

Loft and garage conversions

Loft conversions need new lighting and socket circuits run up through the property, often via a new sub-circuit from the consumer unit rather than an extension of an existing one, to keep loading and cable runs sensible. Access constraints in an occupied loft space affect how first fix is sequenced compared with an empty shell.

Garage conversions into habitable rooms or home offices bring similar considerations, plus the question of whether the existing garage supply was ever designed for continuous domestic use or was only intended for occasional power tool use.

New builds and full first-to-second-fix work

A new build room or a full gut renovation allows electrical design from a blank slate: circuit layout, consumer unit position and cable routes can all be planned together rather than fitted around existing constraints. This tends to produce a cleaner, easier-to-maintain installation than incremental additions.

Sequencing still matters. First fix happens after structural work but before plastering, and second fix happens after decoration but before flooring in most cases, so the order agreed with other trades at the start of the project should be followed through to the end.

Outbuilding and garden supplies

A new supply to a shed, garden office or workshop needs its own circuit protection, correctly rated cable for the distance run, and appropriate protection against the cable being damaged if buried underground. This is priced and designed on its own merits rather than treated as a simple extension of an indoor socket circuit.

Note that EV charge point installation is not offered as part of this or any other service, since it requires OZEV accreditation that is not currently held. This is worth knowing early if a new supply is being considered partly with future EV charging in mind.

Common questions

New Electrical Installations: the questions people ask first

How much does a new electrical installation cost?+

Every project is priced individually based on drawings or a site visit, because the number of circuits, cable runs and any impact on the existing consumer unit all vary. A free written quote is provided before work is booked.

How long does new installation work take?+

This depends on scope. A few new circuits for an extension might take a day or two across first fix and second fix; a full new build room takes longer. Timescales are confirmed as part of the written quote.

What is first fix and second fix?+

First fix is the cabling and back boxes installed before plastering and flooring. Second fix is connecting sockets, switches and light fittings once decoration is complete, followed by testing.

Will new circuits need a bigger consumer unit?+

Sometimes. If the existing board is already close to capacity, a consumer unit upgrade is often recommended alongside the new circuits, priced separately and explained clearly before work starts.

Do I get certification for new circuits?+

Yes. New circuits are tested to BS 7671, an Electrical Installation Certificate is issued, and notifiable work is registered through NAPIT.

Can you install an EV charge point as part of a new installation?+

No. EV charge point installation is not currently offered, as it requires OZEV accreditation that is not held. This is worth flagging early if a new supply is intended for future EV charging.

Do you coordinate with builders and other trades?+

Yes. First fix is sequenced around plumbing, plastering and joinery so cable routes are agreed in advance and the job runs to the wider project schedule.

Are you qualified and insured for new installation work?+

Yes. Jackson's Electrical Contractors is a NAPIT Approved Domestic Installer, registration number 79130, holding NVQ Level 3 in Installing Electrotechnical Systems and Equipment with a passed AM2 assessment, £2 million public liability cover and £250,000 professional indemnity cover.

Do you cover Farnborough, Guildford and Farnham as well as Fleet?+

Yes. New installation work is carried out across Fleet, Farnborough, Aldershot, Guildford, Farnham, Camberley, Ascot, Yateley and Sandhurst. If you are just outside that list, call and you will get a straight answer.

How do I pay, and is a deposit required?+

Bank transfer is preferred. A deposit is required on larger new installation projects due to material costs, with the balance due on completion.

Free, no-obligation quote

Get your new installation designed and quoted

Call 07828 148715 with your drawings or a description of the project. You will get a written, individually priced quote covering first fix through to final testing and certification.

07828 148715
  • NAPIT Approved Domestic Installer, Reg. 79130
  • £2m public liability, £250,000 professional indemnity
  • NVQ Level 3 qualified with AM2 passed
  • Free quotes, priced on the actual job
Call Now Free Quote